EasyManua.ls Logo

Festo CP-FB13-E - Operation with the General DP Master

Festo CP-FB13-E
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Commissioning
2-35
Festo P.BE-CP-FB13-E-EN en 0112e
Recommendation:
Providing the safety concept of your machine/system per-
mits, commission the CP system with both operating voltages
(pins 1 and 2), but without compressed air . Y ou therefore
have a suitable test function which does not trigger undesired
reactions.
Please note
A CP valve location occupies two addresses. The following
applies:
– lower-value address: pilot solenoid 14
– higher-value address: pilot solenoid 12

Table of Contents