EasyManua.ls Logo

Festo CP-FB13-E - Page 84

Festo CP-FB13-E
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Diagnosis
3-8
Festo P.BE-CP-FB13-E-EN en 0112e
Starting the test routine
1. Switch off the power supplies (pins 1 and 2) on the node.
2. Switch off the load voltage supply on the output modules.
3. Remove the cover of the DIL switches.
4. Note the settings of the address selector switch and the
DILswitchelements.
5. Set station number 199.
6. Switch on the power supplies (pins 1 and 2).
7. Start the test routine. Set DIL switch element 1 to OFF.
If faults occur when the test routine is started, the red LED
onthenodewillflashfast.Theproceduremustthenbere-
peated.
Concluding the test routine
1. Switch off the power supplies (pins 1 and 2) on the node.
2. Set the address selector switch and the DIL switch
elements to their original positions.
Switch off the power supplies again when the test routine is
concluded:
S on the node
S on the output modules.

Table of Contents

Other manuals for Festo CP-FB13-E

Related product manuals