2. Commissioning
2−18
Festo P.BE−CPX−FB11−EN en 0503b
2.2 Bus configuration
General instructions on commissioning
Before commissioning or programming, compile a configur
ation list of all connected field bus slaves. On the basis of this
list you can:
carry out a comparison between the NOMI NAL and the
ACTUAL configurations to ascertain if there are any
connection faults.
recognise a faulty device after a service replacement.
Configuration of the CPX
terminal requires a very accurate
procedure, as different configuration specifications may be
necessary for each slave on the DeviceNet, due to the modu
lar structure. Note here the specifications in the sections
which follow.