EasyManua.ls Logo

FireClass DUO-CEL - 9 System Handover; 10 System Maintenance

FireClass DUO-CEL
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EQUIPMENT: DUO-CEL WRITTEN BY: RKP
PUBLICATION: OM_DUO-CEL_INST CHECKED BY: AJC
ISSUE No. & DATE: 2 13/10/10
PAGE 24 of 30
9. System Handover
Once the panel and repeaters have been installed
and fully tested in accordance with the site specific
requirements, the front cover of the enclosure can
be attached to the panel and repeaters.
The ACCESS keys should be removed from the
panel and repeaters and handed over to the site‟s
designated Responsible Person.
All authorised users must be given adequate
instruction and training on the operation of the
system.
10. System Maintenance
System maintenance details can be found in the
logbook.

Table of Contents

Other manuals for FireClass DUO-CEL

Related product manuals