EasyManua.ls Logo

flexicoil 6000 - Daily Maintenance (Every 10 Hours)

Default Icon
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 3 - MAINTENANCE
page 3-4
Daily Maintenance Points
DAILY MAINTENANCE (Every 10 Hours)
1. Visually inspect wheel bolts for looseness. Torque
wheel bolts after the first 10 hours of operation and
frequently thereafter. Refer to the Specifications
Section for tire pressure and wheel bolt torque
information.
2. Grease the ball sockets (2) located on each end of the
load leveler bar (2 load leveler bars per machine).
3. Grease the level bar pivot pin (3) (2 pins per unit).
Grease zerk is located on the top side of the pin.
4. Grease the caster wheel walking beams (4) (1
[optionally 3] walking beams per machine).