EasyManua.ls Logo

FMC Technologies Sening EPE2 - To Make the Job of the Service Personnel Easier; Maintenance

FMC Technologies Sening EPE2
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPE2-Controller for Meter Draining System
EPE2
Installation Manual
Sening®
Innovative Tank Truck Systems
12 Rev. 1.03 / JS / jp / March 2010 MN F08 003 US / DOK-450E
If wires have to be trimmed, no cable residues must be allowed to fall into the open unit. This
could cause short circuits on the printed circuit board.
There must never be any connection between the housing/shield and the 0V terminal. Oth-
erwise functional errors can occur.
Install the solenoid valve upright, i. e. the magnetic coil must point upwards.
2.1.4 To make the job of the service personnel easier
Install the junction boxes such that they are easily accessible.
Even the electronic housings should be installed such that they are easily accessible.
Cables without plug-in connectors may be shortened.
Slightly lubricate the fixing bolts of the covers prior to installation (e.g. copper paste, graphite
grease). This prevents the screws from corroding and ensures that you can loosen them after
prolonged operation.
2.2 Maintenance
The EPE2-Controller for Meter Draining System are maintenance free. The device must not be
modified mechanically or electronically in any way.
During cleaning with a steam cleaner or with pressurised water, the device should be pro-
tected from the water jet. Never aim the steam jet directly onto the device!
§
We won’t accept liability for any damage caused by water invasion in the equipment caused
by improper cleaning.

Table of Contents

Related product manuals