EasyManua.ls Logo

Friedrich VRP7k - Page 32

Friedrich VRP7k
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32 PB
INSTALLATION
Wall Plenum Installation
15
Wall Plenum Installation
Step 2 - Inside Wall Plenum Half
Caulk all 8
Flange Corners
and Unused
Holes
Detail A
1) Apply sealant to all 4 ange corners and unused holes. See Detail A.
2) Flash the inside of the rough opening to ensure the proper t and level.
3) Insert inside plenum half (Part B) into Outside Plenum Half (Part A). Ensure that Part A does not back out of
the rough opening.
4) Remove the inside plenum half.
5) Apply sealant to the outside plenuem half and insert into the rough opening to ensure a water-tight seal.

Table of Contents

Related product manuals