Design Information | 3
M2320121_en | Installation instructions Pellet boiler PECO 11
For planning and installation, comply with the following points:
▪ Position the measuring port (M) downstream of the electrostatic particle separator (E)
as specified in the instructions
Ü "Measuring port" [}10]
▪ Locate the electrostatic particle separator in accordance with the planning for the flue
gas system
▪ Install the electrostatic particle separator in accordance with the manufacturer's
instructions supplied