EasyManua.ls Logo

Froling PECO - 5.7.2 Preparing the boiler for transport and setup (boiler type 25-35)

Froling PECO
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 | Assembly
32 M2320121_en | Installation instructions Pellet boiler PECO
5.7.2 Preparing the boiler for transport and setup (boiler type 25-35)
The following preparations are necessary in order to lift the boiler type 25-35 from the
pallet with the Froling KHV 1400 boiler lifting system and transport it with a forklift or
similar lifting device.
r Open the insulated door
r Release the clamps and remove from the ash container from the boiler
r Remove the cover plate on the inside of the insulated door
r Disconnect both display cables (A) and pull them out of the insulated door
r Remove the cover on the upper hinge and unhinge the insulated door
r Unlock the cover by undoing the retaining screws
r Lift the cover on the front edge slightly and remove it towards the front
r Undo the screws on the front cover plate
r Unlock cover plate to the right and lift off to the front

Table of Contents