5 | Assembly
44 M2320121_en | Installation instructions Pellet boiler PECO
5.10 Final installation steps
r Insert side panel into lugs (A) and attach at the top
r Insert the cover at the rear and attach it with retaining screws
5.10.1 Insulate the connection line
When using the optionally available thermal insulation supplied by Fröling GesmbH,
perform the following steps:
r Cut the half shells of thermal insulation to length and lay them on the connection line
r Create an opening for access to the measuring port
r Apply protective foil at the projecting lugs
r Glue the half shells to each other