5 | Assembly
28 M2320121_en | Installation instructions Pellet boiler PECO
5.2 Tools required
The following tools are required for assembling the boiler and suction module:
Spanner or box wrench set
Set of Allen keys
Flat head and cross-head screwdrivers
Pipe wrench or water pump pliers (1")
Cordless screwdriver and set of Torx bits (T20, T25, T30)
Power drill with masonry drill bit Ø12 mm
5.3 Transport
The product is delivered on pallet(s) in cardboard packaging.
NOTICE
Possibility of damage to components if handled incorrectly
r Follow the transport instructions on the packaging
r Transport components with care to avoid damage
r Protect components against damp
r Pay attention to the pallet's centre of gravity when lifting
5.4 Positioning
Transport with fork-lift or similar lifting device
r Position a fork-lift or similar lifting device at the pallet and bring in the components

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Froling PECO and is the answer not in the manual?

Froling PECO Specifications

General IconGeneral
BrandFroling
ModelPECO
CategoryStove
LanguageEnglish