Assembly | 5
M2320121_en | Installation instructions Pellet boiler PECO 27
5 Assembly
IMPORTANT: The individual parts of the boiler insulation covered with a protective
film. The protective film must be removed before proceeding with the installation!
5.1 Included in delivery
The boiler comes on a pallet together with the suction module and accessories. Some of
the components come in cardboard packaging.
A PECO
Ü "Installing the boiler" [}31]
D Hose clamps
Ü "Connect the suction hoses to the
boiler" [}38]
B External suction module
Ü "Installing the external suction
module" [}36]
E Accessories (cleaning equipment, socket
wrench, mounting bracket (for boiler type
25-35), controller accessories included in
ash container (sensor, immersion sleeve
etc.))
C Protective plate for flue pipe
Ü "Install the protective plate for the flue
pipe" [}35]
Not pictured: installation and operating instructions, guarantee certificate, identification
plate