EasyManua.ls Logo

Froling PECO - 5.7.4 Prepare for room air-independent operation

Froling PECO
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 | Assembly
34 M2320121_en | Installation instructions Pellet boiler PECO
5.7.4 Prepare for room air-independent operation
r Remove the covering grid plate on the rear of the boiler
r Loosen both screws (A) on the supply air connection
ca. 30 mm
r Pull back the bracket for the supply air connection until approx. 30 mm of pipe is
protruding
r Secure both screws
r Remove the grill from the cover plate
r Remove the burrs with a half-round file
r Fit the cover plate to the supply air connection

Table of Contents