Assembly | 5
M2320121_en | Installation instructions Pellet boiler PECO 33
r Remove the protective plate from the bottom of the boiler
r Pull out floor insulation
The Froling KHV 1400 boiler lifting system can now be used to lift the boiler off the pallet
and the boiler can be transported using a forklift or similar lifting device.
Assemble all components in reverse order.
5.7.3 Aligning the boiler on the floor
For the boiler type 15-20, the adjustable feet are adjusted from the outside, for boiler type
25-35, the adjustable feet are only accessible by removing the front protective plate, Ü
"Preparing the boiler for transport and setup (boiler type 25-35)" [}32].
r Lift the boiler up off the floor and use the adjustable feet to level it
Ä To avoid structure-borned sound transmission, the bottom of the boiler may not
rest on the floor