EasyManua.ls Logo

Froling PECO - 5.5 Temporary storage

Froling PECO
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly | 5
M2320121_en | Installation instructions Pellet boiler PECO 29
Positioning using a crane:
r Open the insulated door
r Unlock the cover by undoing the retaining screws
r Lift the cover on the front edge slightly and remove it towards the front
15-20: 25-35:
r Transport the boiler using a crane hook
5.5 Temporary storage
If the system is to be assembled at a later stage:
r Store components at a protected location, which is dry and free from dust
Ä Damp conditions and frost can damage components, particularly electric ones!

Table of Contents