Assembly | 5
M2320121_en | Installation instructions Pellet boiler PECO 29
Positioning using a crane:
r Open the insulated door
r Unlock the cover by undoing the retaining screws
r Lift the cover on the front edge slightly and remove it towards the front
r Transport the boiler using a crane hook
5.5 Temporary storage
If the system is to be assembled at a later stage:
r Store components at a protected location, which is dry and free from dust
Ä Damp conditions and frost can damage components, particularly electric ones!