PV Point Comfort
Safety
WARNING!
Danger due to electrical voltage on live parts of the photovoltaic system.
This can result in serious injury and damage to property.
▶
Disconnect live parts of the photovoltaic system on all pins and on all sides.
▶
Secure against re-activation in accordance with national regulations.
▶
Allow the capacitors of the inverter to discharge (2 minutes).
▶
Check that the inverter is de-energised with a suitable measuring device.
WARNING!
Danger due to work that has been carried out incorrectly.
This can result in serious injury and damage to property.
▶
Installing and connecting an option must only be carried out by service per-
sonnel trained by Fronius and only within the scope of the respective tech-
nical regulations.
▶
Follow the safety rules.
WARNING!
Danger due to damaged and/or contaminated terminals.
This can result in serious injury and damage to property.
▶
Before making any connections, check the terminals for damage and con-
tamination.
▶
Remove contamination in the de-energized state.
▶
Have defective terminals repaired by an authorised specialist.
NOTE!
The continuous supply via the PV Point depends on the available PV power.
If the solar modules are not supplying enough power, interruptions may occur.
▶
Do not connect any loads that require an uninterruptible supply.
IMPORTANT!
The valid national laws, standards and provisions, as well as the specifications of
the relevant grid operator are to be taken into account and applied.
It is highly recommended that the specific installation be agreed with the grid
operator and explicitly approved by this operator. This obligation applies to sys-
tem constructors in particular (e.g. installers).
Scope of supply The PV Point Comfort is an optional extra and can be retrofitted to the inverter.
For technical data, see "Technical data" on page 182.