EasyManua.ls Logo

Fronius PV Point - Page 10

Fronius PV Point
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Quick guide PV Point & PV Point Comfort 1015
6. The PEN connection is supplied and must be connected according to the instructions in chapter
2.2 with the earthing terminal block.
7. For three-phase inverters, L2 and L3 are wired directly past the PV Point Print, while L1 and N
are looped via the Print, as this must also provide power in parallel grid operation. As a nal
step, connect L1 and N coming from the grid directly to the terminal of the Comfort Print.

Related product manuals