EasyManua.ls Logo

Fronius TransTig 800 - Page 51

Fronius TransTig 800
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Fit ferrules to phase conductors and the ground conductor of the mains
cable; crimp ferrules with pliers
CAUTION!
Risk of short circuits!
If ferrules are not used, there is a risk of short circuits between the phase
conductors or between phase conductors and the ground conductor.
Fit ferrules to all phase conductors and the ground conductor of the
stripped mains cable.
4
Undo the screws (2 x) and clamping
nut (size 30) on the strain-relief
device
P
E
W
1
V1
U1
5
7
8
6
5
Insert the mains cable into the
strain-relief device
NOTE!
Push the mains cable in far enough to
make it possible to connect the
ground conductor and the phase con-
ductors to the block terminal prop-
erly.
6
Tighten the clamping nut (size 30
mm)
7
Tighten the screws (2 x)
8
Connect the mains cable to the
block terminal correctly:
-
Ground conductor (green, or
green with yellow stripes) to
the PE connection
-
Phase conductors to connec-
tions L1 - L3
9
Re-fit the left side panel of the
power source
51
EN

Table of Contents

Related product manuals