EasyManua.ls Logo

Fuji Electric PXR4 - Index

Fuji Electric PXR4
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 9 –
Index
(Note) *To start the operation, wait for about 30 minutes after the power-on for warm up.
<Reference items>
<Description>
Error indications
8
Power on
Wiring
2
Usages
3
Display and operation
4
Setting method of temperature and parameters
5
Functions
6
Setting of input type and control algorithm.
7
Operation
Installation/mounting
1
Confirming type specification
• Confirming that the delivered
controller is equal to the ordered
one.
• Outline dimensions
• Panel cutout dimensions
• Mounting method on the panel
• Set value change method
• Basic operation method
• List of parameters
• List of input/output/alarm codes
• Setting of input type and ranges
• Selecting of control method
• Terminal connection diagram
*Note

Related product manuals