– 9 –
Index
(Note) *To start the operation, wait for about 30 minutes after the power-on for warm up.
<Reference items>
<Description>
Error indications
8
Power on
Wiring
2
Usages
3
Display and operation
4
Setting method of temperature and parameters
5
Functions
6
Setting of input type and control algorithm.
7
Operation
Installation/mounting
1
Confirming type specification
• Confirming that the delivered
controller is equal to the ordered
one.
• Outline dimensions
• Panel cutout dimensions
• Mounting method on the panel
• Set value change method
• Basic operation method
• List of parameters
• List of input/output/alarm codes
• Setting of input type and ranges
• Selecting of control method
• Terminal connection diagram
*Note