EasyManua.ls Logo

FujiFilm RYB751S3-VBC - 4-1) Test operation in two stages

FujiFilm RYB751S3-VBC
252 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
TEST OPERATION
4-2
4-1) Test operation in two stages
Perform test operation in the following two stages.
n First stage
n Second stage
Check wiring and product or parameters.
Use only the servomotor and servo amplifier without connection of the servomotor to the machine,
and perform test operation.
Check the parameters of the servo amplifier.
Mount the servo amplifier to the host controller and the machine to perform test operation.

Table of Contents