EasyManuals Logo

Fujitsu BS2000 Basic Operating Manual

Fujitsu BS2000
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #78 background imageLoading...
Page #78 background image
Switching the SE700 / SE500 on and off Switching the server on and off
78 U41858-J-Z126-2-76
2. Switch on the MU
The power-on indicator (item 11 in figure 10 on page 50) lights up orange (POWER
STAND-BY).
Ê Switch on the rack console by pulling out and folding out the monitor, see page 33.
Ê Press the On/Off switch on the MU (item 12 in figure 10 on page 50).
The power-on indicator lights up green. The MU switches itself on, conducts a system
test and starts the M2000 software. This takes a little time. Finally, on the rack console
you see the login window for the Linux desktop of the local console.
Ê Call the SE Manager, e.g. after logging in on the local console via the browser of the
Linux desktop (in the “Computer” menu in the task bar) or via an administration PC
(default), see the “Operation and Administration” manual [5].
Redundant MUs are switched on in the same way.
You can also switch on the MU remotely via the iRMC of the MU, see the “Operation and
Administration” manual [5].
3. Switch on the Server Unit SU /390
Ê As the administrator, BS2000 administrator or a privileged operator, switch on the
Server Unit using the SE Manager (menu Hardware
Units[ <se server>] (SE<model>), Units tab, Switch on symbol), see the “Operation and
Administration” manual [5].
Alternatively you can switch the Server Unit on by pressing the POWER ON button on the
server's control panel (see page 44). The system is ready when the status indicator on the
server's control panel displays no further error codes.
Then you can call an SVP console window in the SE Manager and start the BS2000 system
using PROGRAM LOAD FRAME: DETAIL-1.
When a POWER ON IPL is configured, the BS2000 system is loaded automatically (using
AUXILIARY FRAME: LOAD PRESET1).
Alternatively the IPL can also be initiated in the SE Manager (see the menu Systems
[<se server> (SE<model>) ] <unit> (SU</390>) BS2000 operation mode, “Operation and
Administration” manual [5]).
i The control panel and SVP frames of the Server Unit are described in the "Server
Unit /390" Operating Manual [2].

Table of Contents

Other manuals for Fujitsu BS2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu BS2000 and is the answer not in the manual?

Fujitsu BS2000 Specifications

General IconGeneral
BrandFujitsu
ModelBS2000
CategoryServer
LanguageEnglish

Related product manuals