2. Installation
Installing in a Rack
FUJITSU Storage ETERNUS AF, ETERNUS DX Configuration Guide (Power Synchronized Unit)
Copyright 2019 FUJITSU LIMITED P3AM-8012-14ENZ0
35
Installing a Power Synchronized Unit
This section describes how to install a power synchronized unit in a rack.
■ Checking the package contents of the rack mount kit
Check the following package contents to confirm that there are no missing parts. If there are missing parts, con-
tact your sales representative.
■ Procedure for installing a power synchronized unit
1 Open the front and rear doors of the rack.
2 Attach the M6 cage nuts to the rear rack pillar.
• Attachment positions
Insert four M6 cage nuts in the 1st and 3rd holes above the power synchronized unit base line.
❏ L-shaped bracket: 2
Same for right and left.
❏ M3 flat head screw: 4
For attaching L-shaped brack-
ets
❏ M6 cage nut: 4
Used when the holes in the rack
pillars are square
❏ M6 cross recessed head screw
with captive washer: 4
❏ Blank panel: 1
(Rear rack pillars)
Base line of
power synchronized unit
1st position
3rd position
1U (power synchronized unit size)