4. Connection and Settings
Checking after Connection
FUJITSU Storage ETERNUS AF, ETERNUS DX Configuration Guide (Power Synchronized Unit)
Copyright 2019 FUJITSU LIMITED P3AM-8012-14ENZ0
61
ETERNUS DX60 S2
End of procedure
Checking after Connection
After connecting all the devices, check that the POWER LED on the power synchronized unit is green or blinking
green. Perform a test to check that the ETERNUS DX/AF turns on/off with the server as necessary.
Check the following operations when performing a test.
For details about LEDs and the status of power synchronized units that are on, refer to "Table 2
Status and mean-
ings of each LED (for power synchronized units)" (page 24).
If a power synchronized unit is not operating properly, refer to "
Troubleshooting" (page 71).
(1)Check the connection status
Turn on/off each server, and check that the linked ETERNUS DX/AF also turns on/off.
(2)Check scheduled operations and power outage settings
Check that the ETERNUS DX/AF turns on/off in accordance with the linked server for the scheduled operations
and the power outage settings.
- Power on by scheduled operations
Check that the ETERNUS DX/AF turns on in accordance with the linked server for the scheduled operations.
- Power off by scheduled operations
Check that the ETERNUS DX/AF turns off after all of the linked servers are turned off by a scheduled opera-
tion.
- Power off due to power outages
Simulate a power outage and check that the ETERNUS DX/AF turns off after all of the linked servers are
turned off according to the power outage settings.
- Power on after power recovery
Simulate power recovery and check that the ETERNUS DX/AF turns on in accordance with the linked server
by the power recovery settings.
Controller 0 (CM#0) Controller 1 (CM#1)
For the status of power on/off requests from a power synchronized unit to an ETERNUS DX/AF, check the POWER
SENSOR LED on the power synchronized unit.
On
The ETERNUS DX/AF is requested to be turned on after detecting AC output from a server UPS unit.
Off
The ETERNUS DX/AF is requested to be turned off after detecting no AC output from all of the server UPS units.