EasyManua.ls Logo

Fujitsu ETERNUS AF Series - Checking after Connection

Fujitsu ETERNUS AF Series
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 Connection and Settings
4.6 Checking after Connection
FUJITSU Storage ETERNUS DX, ETERNUS AF Configuration Guide (Power Synchronized Unit)
Copyright 2017 FUJITSU LIMITED P3AM-8012-10ENZ0
64
4.6 Checking after Connection
After connecting all the devices, check that the POWER LED on the power synchronized unit is green or
blinking green. Perform a test to check that the ETERNUS DX/AF turns on/off with the server as necessary.
Check the following operations when performing a test.
For details about LEDs and the status of power synchronized units that are on, refer to "Table 1.2
Status and
meanings of each LED (for power synchronized units)" (page 25).
If a power synchronized unit is not operating properly, refer to "6.3
Troubleshooting" (page 73).
(1)Check the connection status
Turn on/off each server, and check that the linked ETERNUS DX/AF also turns on/off.
(2)Check scheduled operations and power outage settings
Check that the ETERNUS DX/AF turns on/off in accordance with the linked server for the scheduled
operations and the power outage settings.
- Power on by scheduled operations
Check that the ETERNUS DX/AF turns on in accordance with the linked server for the scheduled
operations.
- Power off by scheduled operations
Check that the ETERNUS DX/AF turns off after all of the linked servers are turned off by a scheduled
operation.
- Power off due to power outages
Simulate a power outage and check that the ETERNUS DX/AF turns off after all of the linked servers are
turned off according to the power outage settings.
- Power on after power recovery
Simulate power recovery and check that the ETERNUS DX/AF turns on in accordance with the linked
server by the power recovery settings.
For the status of power on/off requests from a power synchronized unit to an ETERNUS DX/AF, check the
POWER SENSOR LED on the power synchronized unit.
On
The ETERNUS DX/AF is requested to be turned on after detecting AC output from a server UPS unit.
Off
The ETERNUS DX/AF is requested to be turned off after detecting no AC output from all of the server UPS
units.

Table of Contents

Other manuals for Fujitsu ETERNUS AF Series

Related product manuals