EasyManua.ls Logo

GE Grid Solutions Multilin 9450 - Page 94

GE Grid Solutions Multilin 9450
152 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6–16 EPM 9450/9650 ADVANCED POWER QUALITY METERING SYSTEM – INSTRUCTION MANUAL
USING THE EPM P40NPLUS LED EXTERNAL DISPLAY CHAPTER 6: USING THE EXTERNAL DISPLAYS
•Maximum kVA/Hz
• Minimum kVA/Hz
• Maximum Quadrant 1 Total PF
• Minimum Quadrant 1 Total PF
• Maximum Quadrant 2 Total PF
• Minimum Quadrant 2 Total PF
• Maximum Quadrant 3 Total PF
• Minimum Quadrant 3 Total PF
• Maximum Quadrant 4 Total PF
• Minimum Quadrant 4 Total PF
Group 6: Delivered Energy (Use the Left/Right arrows to access the following readings, in
order.)
• +kWatthr Quadrant 1+Quadrant 4 (Primary)
• +kVAhr Quadrant 1 (Primary)
• +kVARhr Quadrant 1 (Primary)
• +kVAhr Quadrant 4 (Primary)
• -kVARhr Quadrant 4 (Primary)
Group 7: Received Energy (Use the Left/Right arrows to access the following readings, in
order.)
• -kWatthr Quadrant 2+Quadrant 3 (Primary)
• +kVAhr Quadrant 2 (Primary)
• +kVARhr Quadrant 2 (Primary)
• +kVAhr Quadrant 3 (Primary)
• -kVARhr Quadrant 3 (Primary)
Group 8: Accumulations (Use the Left/Right arrows to access the following readings, in
order.)
•kI2t A
•kI2t B
•kI2t C
•kV2t A
•kV2t B
•kV2t C
Group 9: Phase Angles (Use the Left/Right arrows to access the following readings, in
order.)
• Phase Angle Van/bn/cn
• Phase Angle Ia/b/c
• Phase Angle Vab/bc/ca
• Phase Sequence
Navigation Map of Dynamic Readings Mode
• Use Left/Right arrow keys to navigate Readings

Table of Contents