Druck ADTS 505 User Manual 4 - 1
K0260 Issue No. 8
4
4 MAINTENANCE
4.1 Introduction
This section details the maintenance tasks to be carried out by the operator. The
maintenance chart shows the maintenance tasks, the periodicity of each task and a code
referenced to the task detailed in 4.3.
* Periodicity may change depending on usage and environment, refer to the Engineering Authority.
TABLE 4-1 MAINTENANCE CHART
Waste Electrical and Electronic Equipment directive 2002/96/EC
Do not dispose of this product as household waste. Use an approved
organisation that collects and/or recycles waste electrical and electronic
equipment. For more information, contact one of these:
• our customer service department:
Contact us at www.ge-mcs.com
• your local government office.
Task Code Period
Inspect A Daily, before use.
Inspect B Weekly
Test C Before use.
Test D Daily, before use.
Calibrate E Every 12 months *
Replace F As detailed in fault finding or when detailed after inspection.
Clean G Weekly *
Service H
1,000 hours recorded by the unit's operational timer or the
equipment running log.
Service J
3,000 hours recorded by the unit's operational timer or 1000 hours
recorded by pump operational timer or the equipment running log.