Illustration 1-2:
6. After you have torqued the bolts, go back every half-hour and check the torque (two times
should be adequate). A
creeping
function of the bolt may have caused the torque to adjust.
Re-torque any bolts which adjusted.
7. After the grouting procedure is completed for on–grade applications, install vinyl trim on cable
access pipe extending through floor and use white lithium grease to lubricate the vinyl trim.
This will protect the trim as cables are pulled through the pipe.
2.4.2.2 Innova
IQ
Table Base plate
1. After grout has hardened remove the foam.
2. Smooth off the air bubble shells and clean off the bottom of the base plate and bolt holes. Any
chips left on the base plate can cause the plate to set up in other than a level position.
Remember, the grout has very high compression strength. Chips will not penetrate the grout
or, for that matter, the bottom of the base plate.
3. Position base plate over the anchor holes, hardstop towards the table. Tap each anchor
through the base plate and into its hole with a hammer. Refer to PIST0002 - Prepare Floor -
LC Base Plate and Omega/InnovaIQ Table.
4. Make sure anchors are seated firmly in the floor and installed securely in place.
NOTE: Bolt heads must not protrude above top surface of basep late.
5. Start by torquing down each of the anchor bolts to 20 ft-lbs (2.7 daN.m) to seat the plate and
keep it from moving. Continue to torque each bolt by 20 ft-lbs (2.7 daN.m) increments until 100
ft-lbs [13.5 daN.m] is reached. Torque sequence is as follows: A-F-E-J-C-H-B-G-D-I (10-holes)
(Refer to Illustration 1-2).
6. After you have torqued the bolts, go back every half-hour and check the torque (two times
should be adequate). A
creeping
function of the bolt may have caused the torque to adjust.
Re-torque any bolts which adjusted.
Single Plane and Biplane Innova Systems Pre–Installation Kit Installation Procedures
GE Healthcare Direction 2290880-12-1EN, Revision 1
Chapter 1 Installation Procedure 25