EasyManua.ls Logo

GE Multilin EPM 6000 - Dnp Point Map Notes

GE Multilin EPM 6000
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5–12 EPM 6000 MULTI-FUNCTION POWER METERING SYSTEM – USER GUIDE
CHAPTER 5: COMMUNICATIONS
5.2.2 DNP Point Map Notes
1. Responds to Function 5 (direct operate), Qualifier Code 7 or 8, Control Code 3, Count 0,
On 1 ms, Off 0 ms ONLY.
2. Responds to Function 6 (direct operate - no acknowledge), Qualifier Code 7, Control
Code 3, Count 0, On 1 ms, Off 0 ms ONLY.
3. The multiplier = 10
(n–d)
, where n and d are derived from the energy format. n = 0, 3, or
6 per energy format scale and d = number of decimal places.
4. Example: If energy format = 7.2 K and watt-hours counter = 1234567, with n=3 (k-
scale) and d = 2 (2 digits after decimal point), then multiplier = 10
(3–2)
= 10, so the
energy is 1234567 × 10 Wh, or 12345.67 kWh.
5. Values greater than 150 V secondary read 32767.
6. Values greater than 300 V secondary read 32767.
7. Values greater than 10 A secondary read 32767. For the 1 A model, the multiplier is (2/
32768) and values above 2 A secondary read 32767.
8. CT ratio = (numerator × multiplier) / denominator.
9. PT ratio = (numerator × multiplier) / denominator.
10. Clear via Function 2 (write), Qualifier Code 0.

Table of Contents

Related product manuals