EasyManua.ls Logo

GE Venue Go - Section 8-2 Internal Parts- Replacement Procedures

GE Venue Go
324 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D
IRECTION 5813707-100, REVISION 2 VENUE™ SERVICE MANUAL
8-2 Chapter 8 - Replacement Procedures
PRELIMINARY
Section 8-2
Internal Parts- Replacement Procedures
8-2-1 Preparations
1.) Shut down the Venue Go™ ultrasound unit, as described in Power Shutdown .
2.) Disconnect the power cord from the back side of the Venue Go™ ultrasound unit.
DANGER
ELECTRICAL HAZARDS EXIST AT SEVERAL POINTS IN THE SYSTEM.
FAMILIARIZE YOURSELF WITH ALL HAZARDOUS VOLTAGES AND
HIGH CURRENT LEVELS BEFORE REMOVING ANY OF THE COVERS.
DANGER
DO NOT WEAR THE ESD WRIST BAND STRAP WHEN REMOVING
PARTS FROM THE POWER SUPPLY UNIT. BEFORE REMOVING ANY
PART OF THE POWER UNIT, TURN THE POWER OFF AND
DISCONNECT THE POWER CORD.
CAUTION
BEFORE REMOVING CIRCUIT BOARDS, TURN THE POWER OFF AND WEAR THE ESD WRIST
BAND STRAP.

Table of Contents

Related product manuals