EasyManua.ls Logo

GE Venue Go - Completing the Setup; System Specifications

GE Venue Go
324 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D
IRECTION 5813707-100, REVISION 2 VENUE GO™ SERVICE MANUAL
Chapter 3 - System Setup 3-15
PRELIMINARY
Section 3-5
Completing the Setup
3-5-1 Purpose of this Section
This section describes how to complete the setup of the Venue™.
3-5-2 System Specifications
3-5-2-1 System Requirements Verification
Verify that the site meets the requirements listed in Chapter 2.
(See: Facility Needs on page 2 - 7.)
Verify that the specifications below do not conflict with any on-site conditions.
3-5-2-2 Physical Dimensions
3-5-2-3 Mass with Monitor and Peripherals
3-5-2-4 Acoustic Noise Level
Less than 55 dB(A) at 20 degrees Celsius, measured in the operators head position, 20 cm in front of
the keyboard’s right corner, at 1.30 m above the floor, and in a distance of 1 meter at all four sides, 1
meter above the floor.
Table 3-13 Physical Dimensions of Venue Go™ System Only
Height Width Depth Unit
33 41 12 cm
13 16.14 4.72 Inches
Table 3-14 Physical Dimensions of Venue Go™ Mounted on Cart
Max. Height Max. Width Max. Depth Unit
125.5 51.5 49 cm
49.4 20.27 19.29 Inches
Table 3-15 Mass of Venue Go™ without Cart and Peripherals
Model Mass [KG] Mass [LBS]
Venue Go™ 6 13.22

Table of Contents

Related product manuals