GE
D
IRECTION GB091046, REVISION 2 VIVID E9 / VIVID E7 BT’13 SERVICE MANUAL
8 - 92 Section 8-6 - Top Console Parts Replacement Overview
8-6-7-2 Remove the Frame w/LCD and Touch Screen (cont’d)
4.) Remove the two (2x) fixing screws with spacers, see: Figure 8-80.
5.) Remove the five (5x) fixing screws used to fix the Frame w/LCD and Touch Screen to the LCD
(plastic) Cover.
6.) Remove the two (2x) fixing screws used to fix the USB Connector Board to the LCD (plastic) Cover.
7.) Carefully, separate the Frame w/LCD and Touch Screen from the LCD (plastic) Cover.
8.) Carefully separate the Frame w/LCD and Touch Screen and the Upper Bezel.
9.) Transfer the existing Main Controller Board to the new Frame w/LCD.
10.)Transfer the High Voltage Backlight Inverter to the new Frame w/LCD.
Figure 8-80 Operator Panel, Upper, without LCD Cover, seen from the rear side
Figure 8-81 Frame w/LCD and Touch Screen (left) and Upper Bezel (right)
FIXING SCREWS WITH SPACERS
FIXING SCREWS
FOR USB BOARD
FIXING SCREWS FOR FRAME W/LCD
AND TOUCH SCREEN