EasyManua.ls Logo

GE XL44 J2B915 - Seal the Openings; Assemble Surface Burners

GE XL44 J2B915
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
[] Seal the Openings
Seal any openings in the wall behind the range
and in the floor under the range when hookups
are completed.
[] Assemble Surface Burners
_ssemble bm'ner as shown.
Grate
Bumer cap
Burnerhead
Electrode
Coektop
CAUTlON:oono operatecook op
withoutallburnerpartsandgratesinplace.
Place bm'ner heads o',er tile electrodes (m tile
cooktop, in the COlTect locations according to
their size.
Medklm head Small head
Large head Extralarge head
Make sure tile slot in tile burner head is
positioned oxer the electrode.
Place tile matching size caps onto tile heads.
Mediumcap Small cap
Frontof range /
Largecap Extralargecap
Make sure that tile heads and caps are placed in
the correct locations.
[] Check Ignidon of Suriace Burners
Operation of all c(_oktop bm'ne_ should be
checked alter tile range, and ,gas suii,) )lx lines
haxe been careflfllv checked fin" leaks.
Electric Ignition
Select a top bm'ner knob and simultaneously
push in and tm'n to LITEposition. Y)u will hear
a clickingso/md indicating proper operation of
tile spark module. Once tile air has been pm'ged
fl'om the supply lines, bm'ne_s should light within
4 seconds. _Mter bm'ner lights, rotate knob out of
tile LITE position. Try each b/m_er in succession
tmtil all bm'ne_ have been checked.
49

Related product manuals