EasyManuals Logo

Gecko in.yj-2 User Manual

Gecko in.yj-2
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
13
The probe assembly must be installed in the spa water in an area where water is not stagnant in order to optimize the
temperature regulation.
To connect the probe assembly cable, insert the JST into the probe connector (P40).
Route the probe assembly cable through one of the molded strain relief channels on the bottom of the spa pack.
Part number:
Regulation probe and overheat captor - 9920-401397
Connecting the probe (regulation and overheat captor) on the heat recovery model in.yj-re
Regulation probe and overheat
captor
Connections

Other manuals for Gecko in.yj-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gecko in.yj-2 and is the answer not in the manual?

Gecko in.yj-2 Specifications

General IconGeneral
BrandGecko
Modelin.yj-2
CategoryControl Systems
LanguageEnglish

Related product manuals