EasyManua.ls Logo

GEM GSM-19

GEM GSM-19
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
140 GSM19 Series Magnetometers - Version 7
GEM Systems, Inc. Advanced Magnetometers
For more technical information, visit www.gemsys.ca
1. From the survey menu, select cycling rate, tuning, time and other parameters in the normal way.
2.
Connect the sensor(s) and, if required, the GPS antenna.
3. Press A-start to proceed.
NOTE:
If tune initialize is set to YES, it is activated at this point. Make sure the sensors
are connected to the unit. Otherwise, tune initialization fails and this affects all
the scheduled base surveys.
Programmable bases can be operated in three different modes:
Immediate
Daily
Programmable
The screen for the base mode used in the last survey is displayed. Press E-new-mode to change the
base mode
SCREEN G3
base start
A-immediate
B-daily
C-programmable D-RS-232

Table of Contents

Other manuals for GEM GSM-19

Related product manuals