Control Panel Startup/Testing
38 Installation Guidelines For 60 Hz EcoGen™ Generators
Before starting, complete the following:
1. Verify generator is OFF.
2. Set generator MLCB (generator disconnect) to
OFF (OPEN).
3. Turn OFF all breakers to be supplied by generator.
4. Verify auxiliary shutdown switch(es) are CLOSED
(I).
5. Check engine crankcase oil level and, if necessary,
fill to oil dipstick FULL mark with recommended oil.
Do not overfill.
6. Inspect fuel supply. Gaseous fuel lines must have
been correctly purged and leak tested in accor-
dance with applicable fuel-gas codes. All fuel shut-
off valves in the fuel supply lines must be open.
During initial startup only, generator may exceed normal
number of start attempts and experience an “OVER-
CRANK” fault. This is due to accumulated air in the fuel
system during installation. Reset control board by press-
ing OFF mode button and ENTER button, and restart up
to two more times if necessary. If unit fails to start, con-
tact an IASD for assistance.