EasyManua.ls Logo

Getinge HS 6613 ER-2 - Process Completion and Verification

Getinge HS 6613 ER-2
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION INSTRUCTIONS -
45
After completion of the process
The control panel displays progress of the process.
Operating from the operator panel Avanti
Process check
Check that the completed process has been carried out correctly by
comparing the process printout with a corresponding type load printout
from the sterilizer validation.
If the lamp does not light up, start is prevented for some
reason (also see chapter Operation and Control unit).
Choose the cycle by pressing the
Cycles
button in the button field.
In order to run the latest cycle, this step
can be skipped.
Press
Start
to start the cycle.
Beware of hot surfaces inside the sterilizer chamber when door is
open!
The “Finished cycle” indicator lights up green after an
error-free cycle is completed.
The panel lights up green and an acknowledgement
key
lights up on the completion of an error-free process.
(Does not apply to automatic loaders)
Press
Open
if the door on the discharge side does not
open automatically.

Related product manuals