EasyManuals Logo

GILBARCO VEEDER-ROOT Latitude LS-100 Installation Manual

GILBARCO VEEDER-ROOT Latitude LS-100
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #53 background imageLoading...
Page #53 background image
Completing Field Wiring Wiring in Unit
MDE-5427E Latitude
Installation Manual · July 2022 Page 6-13
Completing Field Wiring
To complete the field wiring, proceed as follows:
1 Remove the cover of the J-box for models so equipped.
2 Make the connections as shown in Figure 6-3 on page 6-5 through Figure 6-5. Do not disturb
the factory wiring in the J-box and electronics cabinet.
3 For units with J-boxes, use pipe plugs to seal the unused openings in all J-boxes. Replace the
cover on the boxes.
4 Double-check all wiring connections for wire nuts, lugs, caps, and so on. Reinstall the J-box
cover. Ensure that you do not pinch the wires and use all J-box bolts.
5 Reassemble the lower doors and close the doors to the electronics cabinet.

Table of Contents

Other manuals for GILBARCO VEEDER-ROOT Latitude LS-100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GILBARCO VEEDER-ROOT Latitude LS-100 and is the answer not in the manual?

GILBARCO VEEDER-ROOT Latitude LS-100 Specifications

General IconGeneral
BrandGILBARCO VEEDER-ROOT
ModelLatitude LS-100
CategoryPetrol Station Equipment
LanguageEnglish

Related product manuals