9 Maintenance
9.1 Power O the Inverter
DANGER
Power o the inverter before operations and maintenance. Otherwise, the inverter may be
damaged or electric shocks may occur.
Delayed discharge. Wait until the components are discharged after power o.
Step 1 Issue a command to the inverter for halting the grid via SolarGo APP.
Step 2 Turn o the AC switch between the inverter and the utility grid.
Step 3 Turn o the DC switch of the inverter.
9.2 Removing the Inverter
WARNING
Make sure that the inverter is powered o.
Wear proper PPE before any operations.
Step 1 Disconnect all the cables, including DC cables, AC cables, communication cables, the
communication module, and PE cables.
Step 2 Handle or hoist the inverter to take it down from the wall or the bracket.
Step 3 Store the inverter properly. If the inverter needs to be used later, ensure that the storage
conditions meet the requirements.
9.3 Disposing of the Inverter
If the inverter cannot work any more, dispose of it according to the local disposal requirements
for electrical equipment waste. Do not dispose of it as household waste.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Goodwe HT Series and is the answer not in the manual?

Goodwe HT Series Specifications

General IconGeneral
Max DC Input Voltage1100V
MPPT Voltage Range200-1000V
Max AC Output Power3.6kW to 10kW
Number of MPPTs1 or 2
Max PV Input Voltage1100V
MPPT Range200-1000V
AC Output Frequency50/60Hz
CommunicationRS485, Ethernet
Operating Temperature Range-25°C to 60°C
Protection LevelIP65