28
Cutie Frame
Pass the take-up rail through the throat of the machine. Make sure the long half of the take-
up rail is on the right side.
5
Task 8 - Installing the Rails (Continued)
Short Take-up
Rail
Long Take-up
Rail
Place the rail into the grooves on each of the frame sides. The two rectangular notches in the
rails must point down.
6
Open the take-up rail caps by sliding them outward, following the direction of the embossed
arrows.
4
Rail Cap