Operation
3A4802D 11
4. Open the compressor air supply valve (150 psi, 10.3
Bar, 1.03 MPa) maximum.
NOTE: Make sure the air supply meets the appro-
priate air flow requirements (see Technical
Specifications, page 45).
5. Connect the blast hose, hose restraints, control
hoses, and coupler pins.
NOTICE
Do not use a wrench when installing the nozzle. Dam-
age to the seal could occur. To avoid seal damage,
always hand-tighten the nozzle.