Initial Startup
3A2776K 35
c. Open the A side mix manifold inlet ball valve.
d. Press repeatedly to set to
. Press .
Slowly turn metering pump air regulator (CD)
clockwise to increase air pressure until metering
pump A starts. Continue until clean material
dispenses from the A material line then press
to stop pump.
e. Close the A side mix manifold inlet ball valve
then reconnect to the mix manifold. Back out
the metering pump air regulator.
f. Repeat for the B material line.
NOTE: Now all of the material lines are primed except
for the section from the mix manifold to the gun.
25. Perform the Prime Flush Pump procedure on
page 36 to flush out the oil from those lines, and to
finish preparing for spraying.