Thickness of the foundations must be calculated in accordance with the weight of the
system and the installation site.
The foundation must be flat and leveled.
A slope deviation to the left/right or front/back may cause infiltration of water and
damage the charging station.
Foundations must be under the ground.
Charger must be installed on the ground.
6.8. Implantation plan
Prepare the foundations according to the diagram below: