OPERATION 
75 
Master-Slave Parallel Operation 
 
Master-Slave 
Configuration 
Before using the power supplies in parallel, the 
master and slave units need to be configured.   
1.  Configure the OVP, OCP and ULV 
settings for the master unit.  
2.  For each unit, hold the Function key while 
turning the power on to enter the power on 
configuration settings. 
Lock/Local PROT Function Test Set
Output
Unlock ALM_CLR M 1 M 2 M 3
Shift
: Long  Push
VSR LAN RMT ERR DLY ALM ISR M 1 M 2 M 3 RUN
C C
A
C V
V
VOLTAGE CURRENT
PSU 40-38
DC  Power  Supply
0 - 40V / 0 - 38A
Voltage Current
3.  Configure F-93 (Master/Slave) 
setting for each master/slave unit. 
Independent (default setting) 
Master unit with 1 slave in parallel 
Master unit with 2 slaves in parallel 
Master unit with 3 slaves in parallel 
4.  Cycle the power on the units (reset the power). 
Configuration settings can be checked on both the 
master and slave units by pressing the Function key 
and checking F-93. 
Only the Master OVP, OCP and UVL settings are used 
for protection. Slave protection levels are disregarded. 
OHP works independently for each unit.