Transmitter 9125 – Conductivity / resistivity measurement
Page 33
EXECUTION
Execution of a 2 point calibration
Program the manual 2 point calibration and execute it
as follows :
x Remove the electrode from liquid.
x When the measure is stable, the instrument goes
automatically to next step.
The symbol
flashes 10 to 20 seconds.
x Press ENTER to accept the zero calibration.
x Immerse the probe in the calibration solution
x When the measure is stable, press OK.
x Change the value displayed
if you want.
x Modify the date of the calibration if necessary by
pressing
on the right function touch .
To validate the calibration parameters press
ENTER. ESC does not validate the parameters
and the former calibration parameters are kept.