EasyManua.ls Logo

Haier AU96NFTAHA - 9 Essentials of trial run; 1. Sequence of trial run

Haier AU96NFTAHA
131 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
42
6. Judging function of remote controller
(1) Confirm the function of remote controller through outdoor unit
(Judgment sequence)
Switching on the power
For outdoor unit, the switch on the I/F PCB plate will
be set as follows: SW01: "0", SW02: "15".
Operation
Press SW04 on the same PCB for over 2 seconds.
The display of "standby" on the remote controller
connected is on, the display on the 7-segment nixie
tube of I/F PCB is "11"
Confirm connecting remote controller
Press SW04 or SW05 on the I/F PCB for over 2
seconds.
Finish
Other finish conditions:
1. the signal occurred for over 10 minutes;
2. SW01, SW02 were adjusted to other positions.
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Related product manuals