MS1000 Control System
Installation Guide
hanwell.com
Page 29 of 30 GD6063-1
Appendix
MS1000 Control Panel Test Checklist
To Be Completed in all Cases.
Date: Engineers Name :
UUT Model Number: Serial Number :
Test Telemetry ID : Receiver frequency:
Customer Name:
Test Ins.
Ref.
Test Description
Pass/Fail
Y / N
Comments
All connectors and cables tight ?
All Earth leads connected and tight ?
Receiver Module as required on the
order ?
Frequency? MHz
All Fuses correct value and fitted?:
Earth Bonding Test :-
Insulation test :-
Flash test :-
Operation Test :-
SR2 Backup batteries present
(IF SR2 fitted)