EasyManua.ls Logo

Harris HFS6801+ - Unpacking the Module; Preparing the Product for Installation; Checking the Packing List

Default Icon
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HFS6801+ Installation and Operation Manual 11
Chapter 2: Installation
Unpacking the Module
Preparing the Product for Installation
Before you install the HFS6801+, perform the following:
Check the equipment for any visible damage that may have
occurred during transit.
Confirm receipt of all items on the packing list. See “Checking the
Packing List” for more information.
Remove the anti-static shipping pouch, if present, and all other
packaging material.
Note
Contact your Customer Service representative if parts are missing
or damaged.
Retain the original packaging materials for possible re-use.
See “Unpacking/Shipping Information” on page ix for information
about returning a product for servicing.
Checking the Packing List
Table 2-2. Available Product Packages
Ordered Product Content Description
HFS6801+
One front module
One HFS6801+ HD / SD TV Video
Frame Synchronizers Installation and
Operation Manual
HFS6801+D
One front module
One back connector
One HFS6801+ HD / SD TV Video
Frame Synchronizers Installation and
Operation Manual
HFS6801+DR One back connector

Table of Contents