Page 13
INSIDE OF
COIL MOUNTING
n
SHIELD
LUG
1
LOCATING
LUG
LOCATING
SLOT
ING
IS
Detail
2-1C
Detail 2-18 shows the coil mounting locations for the
following steps. Note that the locating lug of each
mil
must
be
positioned in the locating slot, and that each mil.must be
pushed into
its
mounting hole until the mounting ears snap
out to hold the coil in place as shown in Detail 2-1C.
Detail
2-1B
(d
lnstall the 2ameter
mil
(#40965) at CV.
See
Detail
2-1 C.
/
( )
Install three #6 solder lugs on the coil mounting shield
(4
Install
a
10115-meter coil
(#40-964)
at CX.
(#206-457)
at
CL with 6-32 x 318" hardware. Position
the lugs as shown in Detail 2-1
0.
(4
Install a 10115-meter
mil
(#40-964)
at CY.
(d
Install the 8heter coil (#40-1012) at
CS.
;
(d
Install a
#6
solder lug at DF with a 6-32
x
1/4"&rew
and a 6-32 nut. Form the solder lug as shown.
(d
Install the 40meter
mil
(#40-966) at CT.