Page 22
PICTORIAL
3-2
Refer to Pictorial 3-2 for the following steps.
(
d'
Install a .02
pF
disc capacitor between lugs 1 (NS) and
2 (NS) of terminal strip EB.
(
1/11'
Install a .02
pF
disc capacitor between lugs 2 6-2) and
3 (NS) of terminal strip EB.
Cut the black pilot lamp lead from meter
EC
to 3-112"
and the white lead to
4".
(6
Connect
a
.02
pF
dim capacitor between lugs 1 (NSI
and 2 (NS) of meter
EC.
(
Connect a .02
pF
disc capacitor between lug 1 (NS)
and 2 (NS) of meter EA.
(
)
Cut the leads of two .02
pF
disc capacitors to a length
of 112". These capacitors will be used in the next two
steps.
(
/Connect the black pilot lamp lead coming from meter
EC to lug 1 of terminal strip EB (NS).
(4
Connect the white pilot lamp lead coming from meter
EC to lug 3 of terminal strip EB (NS).
I
hut the black pilot lamp lead coming from meter
EA
to 3" and the white lead to
4".
(
'/j
Connect the black pilot lamp lead coming from meter
EA to lug 1 of terminal strip
EB
(NS).
(
vf
Connect the white pilot lamp lead coming from meter
EA to lug 3 of terminal strip EB (NS).
(d
Connect a 3.112'' length of green wire from lug 2 of
rotary switch EU 6-1
)
to lug 2 of control ET (S-1).