EasyManua.ls Logo

Heathkit SB-220 - Page 27

Heathkit SB-220
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 22
PICTORIAL
3-2
Refer to Pictorial 3-2 for the following steps.
(
d'
Install a .02
pF
disc capacitor between lugs 1 (NS) and
2 (NS) of terminal strip EB.
(
1/11'
Install a .02
pF
disc capacitor between lugs 2 6-2) and
3 (NS) of terminal strip EB.
Cut the black pilot lamp lead from meter
EC
to 3-112"
and the white lead to
4".
(6
Connect
a
.02
pF
dim capacitor between lugs 1 (NSI
and 2 (NS) of meter
EC.
(
Connect a .02
pF
disc capacitor between lug 1 (NS)
and 2 (NS) of meter EA.
(
)
Cut the leads of two .02
pF
disc capacitors to a length
of 112". These capacitors will be used in the next two
steps.
(
/Connect the black pilot lamp lead coming from meter
EC to lug 1 of terminal strip EB (NS).
(4
Connect the white pilot lamp lead coming from meter
EC to lug 3 of terminal strip EB (NS).
I
hut the black pilot lamp lead coming from meter
EA
to 3" and the white lead to
4".
(
'/j
Connect the black pilot lamp lead coming from meter
EA to lug 1 of terminal strip
EB
(NS).
(
vf
Connect the white pilot lamp lead coming from meter
EA to lug 3 of terminal strip EB (NS).
(d
Connect a 3.112'' length of green wire from lug 2 of
rotary switch EU 6-1
)
to lug 2 of control ET (S-1).

Other manuals for Heathkit SB-220

Related product manuals