EasyManua.ls Logo

HER CHEE ATV-90 - PDI (PRE DELIVERY INSPECTION); Pre-Delivery Inspection Checklist; Front Brake Assembly Alignment Caution

Default Icon
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
3
PDI (PRE DELIVERY INSPECTION)
(For ATV-50/90/100)
1. Record the frame and engine number into the owner’s manual.
2. Check that all tires have correct pressure specified on the tire or in the owner’s manual.
3. Engine lubrication oil (2 stroke, Grade SAE30) tank is filled.
4. Battery is installed properly.
5. All brake cables are adjusted properly.
6. Fuel tank has enough gasoline to operate.
7. Check the suspension and drive chain for proper setup.
8. Check that all electrical components and lights are working properly.
9. Make sure that the owner’s manual and tool bag are installed under the seat.
If there are any other questions, please check the owner’s manual for details.
CAUTION: Before install the front rim, beware the stopper of front brake plate assembly
must fit into the front knuckle 7-mm plate.

Table of Contents

Related product manuals